This Web Page includes pictures of the Septic System Project from Summer / Fall 2002
New Lateral Lines for Septic System
Summer 2002
SEPTIC SYSTEM PICTURES
Close-up of original installation date (Sept 1984)
Cutting down trees for the new lateral lines
Old distribution box and septic line
Path of original septic line (1)
Path of original septic line (2)
Close-up of original septic clogged with dirt
Digging ditches for the new lateral lines
Digging more ditches - main line
Main line / lateral line connection
About 15 tons of gravel for lateral lines
Hauling gravel to lateral lines
Gravel in ditch for lateral line / distribution box
PVC / corrugated main and lateral lines and connectors
Protective sleeve for lateral lines
Placement of first (of three) lateral line
Continued placement of first lateral line
Placement of new distribution box
Close-up of new distribution box (open)
Placement of second (of three) lateral line
Continued corrugated main line
Placement of third (of three) lateral line
Continued placement of third (of three) lateral line
Gravel left (about 6 tons) to cover lateral lines
Gravel covering main PVC line / first lateral line
Gravel covering second lateral line
Gravel covering third lateral line
Gravel covering end of main line
Close-up of new septic tank cover
Preparing to cover lateral lines with Bobcat tractor
Bobcat tractor next to main line
End of main line before covering with soil
End of main line after covering with soil
End of main line after covering with soil - a few days later
Last third of main line a few days later - showing lateral connections
Upper section of main line a few days later - showing lateral connections
Mid & upper section of main line a few days later - showing lateral connections
View of main line from septic tank a few days later - showing lateral connections