Home ] Courses ] Research ] Students ] Resume ] Publicity ] Family ]

Charles Bidlack ] Bidlack Family ] Geneaology ] School ] Resica ] [ Septic ] Bigfoot ]

 

This Web Page includes pictures of the Septic System Project from Summer / Fall 2002

New Lateral Lines for Septic System

Summer 2002

 

 

SEPTIC SYSTEM PICTURES

Close-up of the septic tank

Close-up of original installation date (Sept 1984)

Cutting down trees for the new lateral lines

Old distribution box and septic line

Path of original septic line (1)

Path of original septic line (2)

Close-up of original septic clogged with dirt

Digging ditches for the new lateral lines

Digging more ditches - main line

Main line / lateral line connection

About 15 tons of gravel for lateral lines

Hauling gravel to lateral lines

Gravel in ditch for lateral line / distribution box

PVC / corrugated main and lateral lines and connectors

Protective sleeve for lateral lines

Placement of main PVC line

Placement of first (of three) lateral line

Continued placement of first lateral line

Placement of new distribution box

Close-up of new distribution box (open)

Placement of second (of three) lateral line

Continued corrugated main line

Placement of third (of three) lateral line

Continued placement of third (of three) lateral line

End of main corrugated line

Gravel left (about 6 tons) to cover lateral lines

Gravel covering main PVC line / first lateral line

Gravel covering second lateral line

Gravel covering third lateral line

Gravel covering end of main line

Close-up of new septic tank cover

Preparing to cover lateral lines with Bobcat tractor

Bobcat tractor next to main line

End of main line before covering with soil

End of main line after covering with soil

End of main line after covering with soil - a few days later

Last third of main line a few days later - showing lateral connections

Upper section of main line a few days later - showing lateral connections

Mid & upper section of main line a few days later - showing lateral connections

View of main line from septic tank a few days later - showing lateral connections

 

 

Many visitors have used this site since Friday, March 03, 2023